Tile-over-tile installation with a supplementary screed.
Structure type
Screed with existing ceramic or stone tiles in good condition that are not to be removed.
Detail
Installation of the new ceramic or stone flooring on a supplementary screed to make up the floor levels.
Application cycle
Sand-cement screed, bonded or floating, with or without an impact sound separating membrane.
Existing tiles, well bonded to the screed, that are not to be removed.
RALLK UltraLevel K build-up layer 3 to 30 mm thick, laid at least 24 hours after spraying or brushing RALLK Primer K acrylic bonding primer onto the existing tiles.
RALLK Kerasiv K Flex adhesive for laying ceramic or stone tiles indoors or outdoors, in small or large formats.
New ceramic or stone finish covering.
Additional information
On smooth or glazed existing tiles, roughen the surface with abrasive brushes and remove all dust before continuing with the system shown.
The build-up layer and the new ceramic or stone covering must be kept away from the perimeter walls with expanded PE strips, so that they do not butt against the plaster.
Avoid drafts in the rooms by keeping windows and doors closed for the first 24-48 hours after laying the build-up layer.
See the individual product data sheets for application methods and precautions.
High-performance, highly flexible professional cement-based tile adhesive.
Choose your language
Start the chat?
The chat is provided by Tawk.to, which uses cookies and processes the data you enter. By starting it you consent to the cookies in the “Chat” category (cookie policy). Alternatively, you can email us at [email protected] or call us on +39 02 7202 3988.